|
|
|
|
|
PROJECT
DEFINITION (1) |
|
|
|
[A]
Definition of Terms |
|
|
In
this document the following
definitions shall apply: |
|
|
Members:
|
the
members of the present
One Air Traffic Management
System EEIG regardless
of whether the Grouping
has been yet dissolved
or not; |
|
|
Unit: |
each
ATS unit of any Member |
|
|
|
|
|
[B] Strategic
Principles (1) |
|
|
|
The
functions addressed
by the One ATM System
shall comprise those
required for provision
of ATM. The One ATM
System shall adopt standardised
building blocks like
a future European FDPS
and the ARTAS Tracker
as well as a harmonised
presentation platform.
It shall comply with
the SES Essential Requirements
and (other) EC Regulations
and Implementing Rules,
as applicable, by adoption
of standardised systems
developed by and available
from industry. It shall
provide the evolution
path for operational
improvements required
by EATMP to satisfy
the capacity required
for accommodation of
the demand in line with
the development of the
aviation industry in
the European ATM Network. |
|
|
|
The
integration of the elements
comprising One ATM System
shall follow existing
standards as far as
practical and available
at the time of implementation.
The integration of new
operational and technical
concepts shall be supported
in a safe, evolutionary
and economic way. |
|
|
|
|
|